Trim, doors and railings in Aurora
Driveways are deep and garages attached in the newer areas, while the older core has narrower drives and a step up at the back door, and the crew books full days because of the drive. Floors are papered, trim is filled and caulked, doors come off for spraying, two coats go on and the tape is pulled while the paint is soft for a clean line. Trim, doors and railings get filled, caulked, sanded and finished in a hard waterborne enamel, with doors sprayed flat where it suits.
Concept imageryAurora, on the ground.
Aurora has century houses with plaster front rooms and later drywall additions in the older core, and newer subdivision housing with nine foot ceilings and builder flat paint east and north of it. Older homes carry layers of oil paint and stained oak that need a bonding primer, and newer homes carry primed MDF trim that needs filling at the joints before the first finish coat. Whole-house interiors, stairwells and foyers, wood window frames and exterior trim, and cabinet refinishing are the usual Aurora jobs.
Where a Aurora house has a later addition, the plaster and the drywall are prepped differently and finished to the same sheen so the join does not show.
Read more about painters in Aurora or the full trim, doors and railings page.
On the quote, from the start.
- 01Baseboards, door and window casings, crown, wainscoting and built-ins prepped and painted
- 02Nail holes and dents filled, every joint and wall gap caulked, and the old finish sanded for adhesion
- 03A bonding primer on glossy or oil-based finishes so the new enamel does not peel
- 04Two coats of waterborne enamel, such as Benjamin Moore Advance or Sherwin-Williams Emerald Urethane, in satin or semi-gloss
- 05Interior doors removed and sprayed flat, or brushed in place where removal is not practical
- 06Stair rails, newel posts and spindles sanded, primed where needed and finished with a brush
No figures published. The drivers, in order.
| Driver | What we look at |
|---|---|
| Metres of trim and number of doors | Each door has two faces and four edges. A main floor with ten doors and crown throughout is a different job from a hallway. |
| Existing finish | Previously painted trim needs a sand and two coats. Stained and varnished trim needs degreasing, a thorough sand and a bonding primer first. |
| Profile and detail | Flat modern trim brushes quickly. Colonial profiles, panelled doors and turned spindles take more time per piece. |
| Spray or brush | Spraying doors and rails gives the smoothest finish but needs more masking. We recommend the method that suits each piece. |
Trim is often added to an interior walls quote, and the two together take fewer days than booking them apart because the room is only protected once. The quote shows trim as its own line either way.
Trim, doors and railings questions from Aurora
Can you paint just the trim in my Aurora home?
Yes. Trim on its own is a common job in Aurora, especially when the walls are fine and the baseboards and doors have gone yellow. We protect the floors and walls, prep and paint the trim and leave the rest untouched.
Do you paint stair railings in Aurora?
Yes. Rails, newel posts and spindles are sanded and finished by hand, in white, black or a colour that matches the trim. A railing in a Aurora home is usually [n] days including cure time between coats.
How do you paint the upstairs hallway wall that runs down the stairs?
With a plank between a ladder on the upper landing and an adjustable ladder on the stair, levelled and secured, and the railing padded. The crew cuts the ceiling line by hand and rolls the wall in one continuous pass so the sheen does not change halfway down. In a newer Aurora house that wall and the foyer are the two items the quote lists on their own.
Our Aurora house is plaster at the front and drywall in the addition. Will the two look the same once painted?
Yes, if the prep is matched. Plaster takes more filling and a full primer over old repairs, drywall takes less, but both end in the same two finish coats at the same sheen. Where the texture differs noticeably at the joint, the crew skims the transition so the eye does not catch it. The colour change, if there is one, is placed at a doorway rather than along the seam.
