1. Home
  2. Services
  3. Commercial and office painting
  4. Aurora
10 · Aurora, York Region

Commercial and office painting in Aurora

Commercial and office painting is scheduled around your hours, in scrub-resistant paint, with the site clean and open at the start of every business day. Aurora has century houses with plaster front rooms and later drywall additions in the older core, and newer subdivision housing with nine foot ceilings and builder flat paint east and north of it. Main-street storefronts bring older walls, tall ceilings and tenants on either side, and newer office and medical buildings bring drywall, metal doors and property-manager rules on hours and paint.

Small office reception area with freshly painted white walls and a navy feature wall, concept imageryConcept imagery
Commercial and office painting · Aurora

Aurora, on the ground.

Driveways are deep and garages attached in the newer areas, while the older core has narrower drives and a step up at the back door, and the crew books full days because of the drive. Each shift covers floors and equipment, fills and primes the walls, paints two coats of a durable commercial line with doors and frames in enamel and resets the site before it reopens.

Where a Aurora house has a later addition, the plaster and the drywall are prepped differently and finished to the same sheen so the join does not show.

Read more about painters in Aurora or the full commercial and office painting page.

What is included

On the quote, from the start.

  1. 01A site visit during your hours to see the traffic, the finishes and the areas that must stay open
  2. 02A written schedule for after-hours, weekend or phased work, agreed with you before the start
  3. 03Floors, fixtures, furniture and equipment covered, and signage and IT masked rather than moved
  4. 04Walls prepped and painted in two coats of a durable commercial line such as Benjamin Moore Ultra Spec Scuff-X or Sherwin-Williams Pro Industrial
  5. 05Doors, frames, trim and railings in a hard enamel that stands up to carts and hands
  6. 06Site cleaned and reset at the end of each shift so staff and customers walk in to a working room
What moves the quote in Aurora

No figures published. The drivers, in order.

DriverWhat we look at
Floor area and wall heightOpen-plan offices and retail with tall walls are measured in square metres of wall, and high ceilings add lift or staging time.
Working hoursAfter-hours and weekend shifts keep you open but shorten the painting day. Phased work adds set-up and clean-up for each zone.
Surface and finishPainted drywall is the baseline. Concrete block, metal doors and frames, exposed ductwork and previously wallpapered walls each need their own primer and method.
Durability requiredA quiet office does well with standard low-VOC paint. A clinic, a daycare corridor or a restaurant kitchen needs scrubbable or washable coatings.

The schedule is the biggest line on a commercial quote. Tell us when the building is empty and when it must be back in use, and the quote is written to those hours.

Commercial and office painting questions from Aurora

Do you paint offices in Aurora after hours?

Yes. Evening, overnight and weekend shifts are how most Aurora commercial jobs run, with low-odour paint so the office is usable the next morning. We agree on the hours with you and the building before the quote is signed.

Can you paint a Aurora storefront while it trades?

Yes, in phases. A shop in Aurora is usually painted overnight, or one wall at a time behind plastic during slow hours, so the door never closes. Exterior signage and the front are done in the morning before opening or after close.

The paint on our wood window frames is peeling outside. Can you repaint them without replacing the windows?

Yes, if the wood is sound. Frames and sashes are scraped, sanded, spot-primed on bare wood and painted with two coats of exterior enamel, with loose glazing compound replaced first. Rotten sills are pointed out rather than painted over. Done in the warmer months, it keeps old windows in service for years, and it is far less than replacing them.

How do you paint the upstairs hallway wall that runs down the stairs?

With a plank between a ladder on the upper landing and an adjustable ladder on the stair, levelled and secured, and the railing padded. The crew cuts the ceiling line by hand and rolls the wall in one continuous pass so the sheen does not change halfway down. In a newer Aurora house that wall and the foyer are the two items the quote lists on their own.

Get a Aurora commercial and office painting quote. One call to book the walk-through.