Trim, doors and railings in Georgina
Much of Georgina's housing began as lakefront cottages and was converted to year-round use, so pine panelling, drywall additions and sun-faded wood siding sit side by side. Older homes carry layers of oil paint and stained oak that need a bonding primer, and newer homes carry primed MDF trim that needs filling at the joints before the first finish coat. Trim, doors and railings get filled, caulked, sanded and finished in a hard waterborne enamel, with doors sprayed flat where it suits.
Concept imageryGeorgina, on the ground.
Painting or clear-coating pine panelling, whole-cottage interiors, lake-side exteriors and trim, and cabinet refinishing make up most of the Georgina work. Floors are papered, trim is filled and caulked, doors come off for spraying, two coats go on and the tape is pulled while the paint is soft for a clean line.
Rooms facing the water in Georgina take strong daylight, so sheen and colour are judged from sample patches in the room before the paint is ordered.
Read more about painters in Georgina or the full trim, doors and railings page.
On the quote, from the start.
- 01Baseboards, door and window casings, crown, wainscoting and built-ins prepped and painted
- 02Nail holes and dents filled, every joint and wall gap caulked, and the old finish sanded for adhesion
- 03A bonding primer on glossy or oil-based finishes so the new enamel does not peel
- 04Two coats of waterborne enamel, such as Benjamin Moore Advance or Sherwin-Williams Emerald Urethane, in satin or semi-gloss
- 05Interior doors removed and sprayed flat, or brushed in place where removal is not practical
- 06Stair rails, newel posts and spindles sanded, primed where needed and finished with a brush
No figures published. The drivers, in order.
| Driver | What we look at |
|---|---|
| Metres of trim and number of doors | Each door has two faces and four edges. A main floor with ten doors and crown throughout is a different job from a hallway. |
| Existing finish | Previously painted trim needs a sand and two coats. Stained and varnished trim needs degreasing, a thorough sand and a bonding primer first. |
| Profile and detail | Flat modern trim brushes quickly. Colonial profiles, panelled doors and turned spindles take more time per piece. |
| Spray or brush | Spraying doors and rails gives the smoothest finish but needs more masking. We recommend the method that suits each piece. |
Trim is often added to an interior walls quote, and the two together take fewer days than booking them apart because the room is only protected once. The quote shows trim as its own line either way.
Trim, doors and railings questions from Georgina
Can you paint just the trim in my Georgina home?
Yes. Trim on its own is a common job in Georgina, especially when the walls are fine and the baseboards and doors have gone yellow. We protect the floors and walls, prep and paint the trim and leave the rest untouched.
Do you paint stair railings in Georgina?
Yes. Rails, newel posts and spindles are sanded and finished by hand, in white, black or a colour that matches the trim. A railing in a Georgina home is usually [n] days including cure time between coats.
We are not at the cottage during the week. Can you work while we are away?
Yes. We ask for a key or a lockbox code and a phone contact, confirm heat and power will be on, and send photos as rooms are finished. Any decision that comes up on site is sent to you with a photo before the crew continues. The final walk-through can be done when you are next up, and the touch-up visit is booked around your schedule.
Can knotty pine walls be painted without the knots bleeding through?
Yes, if every knot is sealed first. Pine resin bleeds a yellow-brown stain through ordinary primer and paint within months. The crew sands the boards, seals the knots and the whole surface with a shellac-based primer, caulks the gaps between boards if you want them to read as one plane, and applies two coats of enamel. Done properly, painted pine stays white for years.
